Monday, 7 March 2016

Life gets in the way

Apologies to the readers out there that follow the build but there hasn't been much progress lately. The boxes of parts are building up in the garage and I have a build week planned towards the end of March but in the meantime I have been tied up redesigning the house so Katie can open her Hypnotherapy business www.clearreflections.co.uk

The picture to the right shows the hallway. There used to be a toilet here; to get through the kitchen you had to walk through the room to the right of where I am stood and walk round to the kitchen (it was all open plan). The room to the right is now the therapy room, with the new false wall shown below.









Next I needed to redesign the kitchen, below are the before and after pictures. I have a few tidy up jobs to complete such as pelmet, an extra bit of granite worktop and some holes to fill.

I still need to rebuild a toilet and utility and a dining room in an extension but that call all wait as the Cobra is getting some time next. 

BEFORE


AFTER






No comments:

Post a Comment